Marso

Task: Complex tender management for the outsourcing of transportation tasks in Hungary and Romania.
Egis

Task: Design of a new ~20,000 pallet automated high-bay warehouse, as well as the automated material handling system serving the plants and the track sections connecting them. Design of a picking warehouse and picking processes, validation of the designed system using a simulation model. Task: Scheduling of a new ~20,000 pallet automated high-bay warehouse, and […]
Axiál

Task: Design of an automated box and narrow aisle manual warehouse at an existing site, rethinking the functions of existing warehouses, and developing logistics processes.
Master Good

Task: Design of the packaging washing area and the associated automated track system for the black and white packaging warehouse of the Kisvárda plant. Task: Design of automatic high-bay warehouses for fresh and frozen finished products and the associated automated track system, and its validation using simulation software modeling. Task: Optimization of the plant layout, […]
Magic Tools

Task: Develop an optimized warehouse operating system and prepare process plans based on which a barcode system-based warehouse management software can be introduced.
Dunafin

Task: Lean development of raw material inbound and outbound processes and the production service system. (highlighted area: determination of the number of material handling machines) “The work carried out greatly helped to rationalize the company’s logistics processes and resulted in significant cost savings for Dunafin. The smooth communication, the team’s attitude and adaptation to individual […]
Marso

Task: Develop a warehouse expansion layout plan, develop storage logic, and prepare process specifications to enable the implementation of a WMS system in warehouse processes.
Ghibli

Task: After recording the status of the logistics processes provided by Ghibli Ltd. to Siemens, to identify and quantify the bottlenecks in the system. The goal is for Ghibli Ltd. to become a JIT supplier to Siemens.
Trans-o-flex

Task: Initiating a lean approach and mindset shift, as well as the lean development of the logistics system of the central, cross-docking site, and the elimination of process elements that cause losses. Task: Layout and process design of the new logistics processes related to the relocation of the central cross-docking warehouse. “The work that the […]
Cerbona

Task: Development of warehouse layout and material flow processes and technological options along multiple objective functions such as maximum material flow efficiency, maximum storage capacity, and minimum investment requirements.
KONE

Task: Complex brownfield warehouse planning and full management and execution of the central warehouse relocation. “During the project to develop our new warehouse base, IdeaLog specialists provided professional and high-quality services throughout. It was very important for us that we were informed about every step of the project in a timely manner, they constantly communicated […]
Siemens

Task: Determination of the reference times of transformer windings as a function of winding parameters, using machine times and manual measurement results. Documentation of the developed methodology and MS Excel application and training for production planners. Task: Development of measurement and statistical evaluation know-how for determining reference times based on the welding processes of the […]